
Now, I can just walk down the hall to practice whenever I want. No more sweating in the church sanctuary in the summer, or freezing in the winter. This is just wonderful!
I'm glad I took the time to do the walls and flooring in my living room before the organ arrived. My living room has now turned into a music studio! :)

I took photos of the organ delivery, to show how it all happened.
Everything on the truck:

Unloading:

Inside the house, I'm waiting for the organ to come in:

Outside, the guys are discussing how to maneuver the organ through the front door:

It's in!

Cover removed:

Here's the bench!

Arranged the way I like:

Pedals attached, and powered on:

Complete! In this photo, I had already spent over an hour practicing on the organ, so I was taking a knitting break.

No comments:
Post a Comment